D1.1 State-of-the-Art Document (due date: December 2016 – M03)

D1.1 describes state-of-the art in integrated system development and Ethernet networking technology in aerospace and automotive industry, and provides a general high-level technology baseline required for design of advanced integrated architectures.

D4.1 Requirements definition for Brake by Wire (due date: December 2016 – M03)

This deliverable contains the collection of information necessary for the definition of requirements. A first iteration of brake system and electronic control and communication requirements will be provided. Standard and technologies applied in other transport sector and suitable for use (or as reference) for railway “brake by wire” systems will be likewise addressed.

D1.2 Initial System Integration Requirements Document for Next-Gen TCMS (due date: March 2017 – M06)

D1.2 collects all initial system functional, safety and performance requirements related to system integration, required for the design of next-gen TCMS. It also includes the rationale for use cases and configuration scenarios for integrated TCMS architectures.

D1.3 Initial Drive-by-Data Draft Concept (due date: March 2017 – M06)

D1.3 describes the draft concept of design and methodology for next generation TCMS.

D5.2 Initial report and updates on dissemination, exploitation and standardisation activities (due date: September 2017 – M12)

This deliverable will include a record of activities related to dissemination and exploitation that have been undertaken and those still planned as well as a report of completed and planned communication activities.

D6.2 Risk Assessment Plan (due date: September 2017 – M12)

The risk assessment plan shows how potential risks are assessed and mitigated in order to avoid any negative influence on the SAFE4RAIL project objectives. The interrelated risk assessment plan – risk identification, handling and monitoring – will be established.

D1.9 Final Drive-by-Data Concept Design (due date: September 2018 – M24)

D1.9 describes the concept of design and methodology for next generation TCMS including all relevant technologies and open issue/gap analysis.

D5.3 Final report and updates on dissemination, exploitation and standardisation activities (due date: September 2018 – M24)

This deliverable will include a record of activities related to dissemination and exploitation that have been undertaken and some going beyond the project lifetime as well as a report of completed communication activities.